Home/SPC Flooring

Flooring / Project and Distribution Supply

SPC Flooring for Distribution and Building Projects

Batic manufactures SPC flooring for importers, distributors, contractors, and project buyers. Rather than asking buyers to choose from appearance alone, we organize each quotation around the intended market, application, construction, finish, quantity, packaging, and delivery requirements.

An initial inquiry does not need to contain every answer. A model, sample, image, or preliminary specification can start the discussion. Before production is released, however, the selected construction, decor, surface, packing method, labels, documents, and commercial terms must be recorded for the specific order.

Technically reviewed by Jones JiangTechnical Consultant with 15 years of relevant experience. Reviewed on September 29, 2026.
Replace image: SPC flooring collection image
Plan the complete supply package

A useful quotation aligns the product and the order rather than treating one isolated value as the complete specification.

  • Application, traffic, and approval requirements
  • Construction, wear layer, underlayer, decor, and texture
  • Quantity, packaging, labels, documents, and delivery
What SPC meansSPC stands for stone plastic composite and is commonly grouped within rigid core vinyl flooring.
What this page helps buyers doOrganize a project or distribution inquiry around the product configuration, approval evidence, packaging, and commercial scope that must be confirmed for the order.

Product category

A rigid core floor planned for the complete order

Batic's current catalog presents a layered floor with a UV coating, wear layer, decorative layer, base layer, and underlayer. The exact build offered for an order is confirmed in the quotation. Layer composition varies by quoted product, so the final construction belongs in the order specification.

This distinction matters to B2B buyers. Two SPC vinyl plank flooring products may look similar while differing in construction, surface, backing, approval reference, packaging, or documentation. A useful comparison covers the complete supply package rather than one isolated value.

Replace image: Layer construction image

Layered construction

Use an approved product cutaway or labeled sample that matches the quoted product.

Replace image: Decor and texture image

Decor and surface

Connect visible color, wood grain, and texture to an identifiable approval reference.

Replace image: Plank and backing detail

Plank and underlayer

Show the selected plank and backing details without implying one universal construction.

Available configurations

SPC flooring thickness and acoustic pad options

Batic can quote SPC flooring in 4 mm, 5 mm, 6 mm, 7 mm, and 8 mm thickness configurations. The floor can be specified without an acoustic pad or with a 1 mm or 1.5 mm acoustic pad.

The quotation should record the selected floor thickness and acoustic pad option separately. Availability of a particular thickness, decor, surface, edge, and pad combination is confirmed for the specific order rather than assumed across the complete collection.

Configuration fieldAvailable options
SPC flooring thickness4 mm, 5 mm, 6 mm, 7 mm, or 8 mm
Acoustic padNo pad, 1 mm, or 1.5 mm
Replace image: SPC plank cross-section and acoustic pad image

Show the selected build

Replace this placeholder with an approved cross-section or sample image that identifies the quoted flooring thickness and acoustic pad.

Buyer decisions

Build the SPC flooring specification around buyer decisions

Where the flooring will be used

The intended application may be commercial space, a residential development, a hotel project, or a distribution program. Expected foot traffic, maintenance routines, site conditions, and approval criteria can all affect product selection. Where a high-traffic area has a particular test or acceptance threshold, that requirement is more useful than a general durability claim.

SPC vinyl plank construction and wear layer

Known requirements may include the overall construction, thickness direction, wear layer, and underlayer or attached underlayment. When these details are still open, the project application and the buyer's specification or standard give the proposal a clearer starting point.

Performance evidence

Performance requirements are useful only when tied to a defined project condition and acceptance method. If the brief calls for waterproof flooring, moisture resistance, scratch resistance, or underfloor-heating compatibility, it should also identify the evidence needed for approval. Batic can then confirm what applies to the quoted configuration without extending one statement to every model.

Decor, color, and surface texture

Color references, plank format, decor direction, surface texture, and the approval method should be considered together. Wood grain and other design options are best tied to an identifiable sample, decor code, approved image, or another controlled reference. A phone photograph can begin the discussion, but it should not be the only color standard used for mass production.

Installation scope and site conditions

The inquiry should identify the intended fitting method, edge requirement, subfloor or substrate condition, and whether accessories or installation documents are part of the purchasing scope. The quotation should distinguish product supply from site preparation, fitting labor, and conditions controlled by the installer. Compatibility questions should be resolved before the order is released.

Packaging, labels, and private branding

Carton, pallet, label, barcode, destination-language, and private-label requirements belong in the quotation brief. Packaging also needs to be considered alongside product construction, shipment method, receiving process, warehouse handling, and the destination market.

Replace image: Color and decor range

Controlled appearance reference

Use approved samples, decor codes, or controlled images for final color and surface decisions.

Replace image: Carton and pallet packaging

Packaging and label review

Connect the packing method and labels to shipment, receiving, warehouse, and destination-market requirements.

Commercial and documentary scope

A useful commercial brief includes the estimated quantity, destination country and port, requested delivery window, sample requirement, inspection arrangement, and importer or project documents. These details create a comparable basis for reviewing price, timing, and supply responsibility.

RFQ preparation

Information to include in the first inquiry

The following inputs help Batic prepare a relevant proposal. Approximate information is enough for an initial review. A formal quotation becomes comparable only after the product reference, final configuration, quantity, packaging, commercial terms, and destination details are controlled.

Inquiry fieldInformation to provide
Market and buyer channelTarget country and buyer channel.
ApplicationCommercial, residential, hotel, or distribution application.
ConstructionPreferred construction and thickness direction.
Wear layer and backingWear layer and underlayer requirements.
AppearancePlank, decor, surface, and color references.
Quantity and timingEstimated quantity and delivery target.
Packaging and brandCarton, pallet, labeling, and private-brand requirements.
Evidence and approvalRequested standards, documents, samples, or inspection steps.
Replace image: SPC sample approval image

Sample and reference approval

Connect the model, sample, specification, or another controlled reference to the final order.

Replace image: Inspection or order-check image

Order-specific acceptance

Use numerical acceptance criteria only when they are supported by the applicable specification, test method, or approved record.

Order control

From sample review to shipment preparation

Inquiry review

The first review brings together the available market, application, product, and commercial inputs and identifies the decisions still needed from the buyer.

Technical alignment

During technical alignment, the proposed core construction, surface, decor, backing, packaging, and evidence requirements are checked against the intended use and order scope.

Quotation

The quotation records the selected product direction, quantity, packing method, payment terms, delivery basis, schedule, and requested documents. Unconfirmed options remain outside the quoted scope.

Sample or reference approval

Before production release, the buyer and Batic confirm the model, sample, specification, or another controlled reference. Any requested change is reviewed for its effect on compatibility, cost, and schedule.

Production and order checks

Production release and inspection criteria are tied to the requirements agreed for the order. Numerical acceptance criteria are used only when supported by the applicable specification, test method, or approved record.

Shipment preparation

Before dispatch, the shipment check covers cartons, pallets, labels, documents, order references, and visible product condition against the agreed requirements.

Buying context

Match the supply program to the buying context

Commercial building projects

Contractors and project buyers should describe traffic, maintenance, approval, delivery, and documentation priorities. The product specification and supply boundary also need to fit the construction schedule and receiving plan.

Residential developments

Residential project buyers should identify the intended areas, visual direction, fitting assumptions, quantity plan, and acceptance method for decor and surface. Room-level claims should not be inferred without the relevant site and performance requirements.

Hotel and hospitality projects

Hospitality programs may require coordinated choices for guest rooms, corridors, public areas, maintenance, sample approval, phased delivery, and future replacement. Recording these priorities early helps keep the approved finish and order references consistent across phases.

OEM and private-label programs

Buyers considering an OEM or private-label program should include decor selection, samples, cartons, labels, barcodes, documents, and expected order patterns in the brief. Feasibility, quantity, cost, and lead time are confirmed for the specific program rather than presented as fixed terms for every buyer.

Buyer questions

Common questions from project and distribution buyers

Is SPC the same as every other vinyl floor?

No. SPC is a rigid core category within the wider vinyl flooring market. Luxury vinyl flooring, LVT, WPC, and other flooring options may use different constructions or serve different buying requirements. Compare the quoted build and intended application, not only the printed decor.

Does every SPC product use one standard specification?

No. Thickness, surface construction, underlayer, decor, packaging, and supporting documents can vary by selected product and order. Batic confirms the applicable combination in the quotation and approval record.

Can a buyer request waterproof or other performance evidence?

Yes. State the required performance, standard, test method, and market or project condition in the inquiry. Batic will confirm which documents or technical checks are available for the proposed configuration; an unsupported category-wide guarantee will not be substituted for project evidence.

Can distributors request private-label packaging?

Private-label requests can be reviewed against the required artwork, language, barcode, carton, and pallet instructions. File readiness, feasibility, quantity, cost, and production timing are then confirmed for the order.

What determines MOQ and lead time?

MOQ and lead time depend on the selected construction, decor, quantity, customization, packaging, and production plan. They are confirmed during quotation instead of being stated as one fixed figure for the whole collection.

Quotation preparation

Prepare a quote-ready flooring inquiry

Send the available model, sample, image, or preliminary specification together with the application, construction direction, decor, quantity, destination, packaging, and delivery requirements. Batic will identify missing inputs before preparing the formal quotation.

  • Application and target market
  • Construction and wear layer
  • Decor and controlled reference
  • Quantity, packaging, and delivery